Wednesday, November 30, 2011
Shacks Ready
The Shack is 99.9% complete. All of the renovations are finished. It took over two weeks to complete the numerous little projects that had to be done to the shack in order to get it ready for ice. We actually made the whole shack about 60 pounds lighter, and a lot stronger. We also got a smaller wood stove, and replaced the heavy front door with a less heavy, reinforced carbon fiber door. Pretty cool right? We had a problem with the picture window fogging up as well, so we invented a manual windshield wiper system made up of cable and pulleys. These small innovations will go a long way this winter!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment